  5. Assessing the impact of stack degradation and replacement on the levelized cost of hydrogen over multi-decadal horizons

Assessing the impact of stack degradation and replacement on the levelized cost of hydrogen over multi-decadal horizons

Publication date
2026-09-23
Document type
Forschungsartikel
Author
Wagner, Lukas Peter  
Henkel, Vincent  
Gehlhoff, Felix  
Organisational unit
Automatisierungstechnik  
DTEC.bw  
DOI
10.1016/j.apenergy.2026.128889
URI
https://openhsu.ub.hsu-hh.de/handle/10.24405/24892
Scopus ID
2-s2.0-105051427958
Project
Optimale Nutzung energetischer Flexibilitäten von Systemverbünden in der Produktion auf Basis intelligenter Agenten  
Publisher
Elsevier
Series or journal
Applied Energy
ISSN
0306-2619
Periodical volume
427, Part B
Article ID
128889
Peer-reviewed
✅
Part of the university bibliography
✅
Additional Information
Language
English
Keyword
Electrolyzer degradation
Levelized cost of hydrogen
Mixed-integer linear programming
Operational flexibility
Sensitivity analysis
Stack replacement
dtec.bw
Abstract
How progressive stack degradation, replacement timing, and operational flexibility interact over multi-decadal plant lifetimes is not well understood. Project developers therefore rely on ad-hoc lifetime heuristics rather than economically grounded replacement strategies. This work develops a degradation-inclusive levelized cost of hydrogen (LCOH) optimization methodology that captures hourly electricity price dynamics, progressive efficiency loss, and an ex-post evaluation of stack replacement policies over a 20-year horizon. A reformulation of the underlying mixed-integer nonlinear problem into a sequence of mixed-integer linear programs makes scenario exploration on standard hardware tractable. A sensitivity analysis across 40 scenarios, spanning capital expenditure from 100 to 1900 €/kW, degradation rates from 0 to 0.20%/1000 h, and an optional 40% minimum hydrogen production target, yields three principal findings. First, capital expenditure dominates LCOH outcomes across all settings, while degradation within the considered range exerts a comparatively modest influence. Second, operational flexibility lets the plant concentrate production in low-price hours, so that this temporal price arbitrage absorbs most of the cost penalty from gradual efficiency loss. Stack replacement is capital-intensive and is most valuable under a minimum hydrogen production target. Without such a target it is marginal, lowering the LCOH at high capital expenditure. Third, under such a target a fixed-schedule evaluation reduces LCOH by up to approximately 7% at 100–500 €/kW in a subset of high-utilization cases, with a smaller benefit at higher capital expenditure. Re-optimizing the operating schedule around the replacement lowers the LCOH further in the benchmark cases examined. These results imply that lowering investment costs and enabling market access for flexible scheduling are more effective levers for reducing hydrogen production cost than incremental improvements in stack lifetime within the examined parameter space.